Seattle in Progress

Seattle in Progress

About Calendar Upgrade to Pro Sign In
  • About
  • Calendar
  • Upgrade to Pro
  • Sign In

5629 119th Ave SE

April 29, 2025: 823781_691800 - T-Mobile Anchor. TOWER SCOPE OF WORK:
REMOVE (3) NOKIA FRIJ RADIOS
REMOVE (3) NOKIA FHFB RADIOS
REMOVE (12) COMMSCOPE ECC1920-VPUB DIPLEXERS
REMOVE (1) NOKIA LARGE COVP JUNCTION BOX
REMOVE (1) 1-3/5" NSN HIGH CAP HCS CABLE
INSTALL BY OTHERS TOWER STRUCTURAL MODIFICATIONS
INSTALL (3) NOKIA AEHC ANTENNAS
INSTALL (3) NOKIA AHFII RADIOS
INSTALL (6) SITE PRO 1 MM0l STAND-OFF'S
INSTALL (3) NOKIA - FPKA RRU MOUNTS
INSTALL (2) SITE PRO 1 LWRM UNIVERSAL RING MOUNTS
INSTALL (3) SITE PRO 1 P3216 MOUNT PIPES

GROUND SCOPE OF WORK
REMOVE (1) NOKIA LARGE COVP JUNCTION BOX
REMOVE (2) FCOA CABINETS
REMOVE (1) SITE SUPPORT CABINET
REMOVE (1) AC POWER PANEL
REMOVE (1) DISCONNECT
REMOVE (1) POWER METER
REMOVE (1) J-BOX
REMOVE (1) TELCO BOX
INSTALL (1) PURCELL HPL3.1 600A SITE SUPPORT CABINET
INSTALL (1) PURCELL LB3 BATTERY CABINET W / (4) BATTERY STRINGS
INSTALL (1) RAYCAP 200 AMP POWER PROTECTION CABINET (PPC) W /BUILT-IN CAM LOK BOX
INSTALL (1) 200A POWER METER W / 200A MAIN DISCONNECT BREAKER
INSTALL (1) PURCELL RAC24
INSTALL (2) TECH LIGHTS W / TIMER SWITCH
INSTALL (1) CONDUIT STEP OVER AT REAR OF HPL3.1 CABINET
INSTALL (1) 24" NEMA PULL BOX
FORTIFY HYBRIDS / (E) HCS 2.0 TRUNK, ADD PUCK LOCKS AND NEMA
BOXES ALONG WITH BINGAMAN LOCK ON CABINET

July 21, 2025: Completed.

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.

Sign up for free calendar updates over email

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Filter by Project Status
Filter by Project Type

Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.