1863 Killarney Way
Feb. 12, 2026: Bill Moor Dock. We propose to repair (12) existing piles using steel sleeves, remove (3) existing piles, remove (19) existing posts, remove (2) existing dolphin piles, install (17) new epoxy coated steel piles, install (3) new epoxy coated steel brace piles, relocate (1) existing boatlift and remove the canopy, install (1) new boatlift, remove the existing moorage cover, and reconfigure and repair the existing dock.
Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.
Sign up for free calendar updates over email
Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.