1863 Killarney Way

Feb. 12, 2026: Bill Moor Dock. We propose to repair (12) existing piles using steel sleeves, remove (3) existing piles, remove (19) existing posts, remove (2) existing dolphin piles, install (17) new epoxy coated steel piles, install (3) new epoxy coated steel brace piles, relocate (1) existing boatlift and remove the canopy, install (1) new boatlift, remove the existing moorage cover, and reconfigure and repair the existing dock.