1863 Killarney Way
April 2, 2026: Moore Project. We propose to repair the existing dock with 761 sqft of gray grated decking, install a 238 sqft ramp down to the dock, remove the existing 578 sqft moorage cover, repair (10) existing wood piles, remove (5) existing piles, remove (2) existing dolphin piles, remove (19) existing posts, and drive (15) new 8-inch epoxy coated steel piles.
Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.
Sign up for free calendar updates over email
Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.