13846 NE 37th Pl
July 17, 2026: Moon Wave ADU. PLACEMENT OF ONE FACTORY ASSEMBLED STRUCTURE MODULE ON SITE BUILT FOUNDATIONS WITH RELATED SITE GRADING, AND UTILITY IMPROVEMENTS INCLUDING: 1. CONNECTION OF NEW UG WATER LINE TO CITY WATER MAIN IN STREET. 2. CONNECTION OF NEW UG SANITARY SEWER LINE TO CITY SEWER MAIN IN STREET. 3. CONNECTION OF NEW UG ELEC LINES TO EXISTING PSE POLE AT STREET ROW. NEW CONDITIONED BLDG STRUCTURES PERMITTED UNDER L&I FAS (FACTORY ASSEMBLED STRUCTURES) PROGRAM. THE SINGLE NEW PREFABRICATED STRUCTURE SHALL BE USED AS A DETACHED ACCESSORY DWELLING UNIT: 1 BDRM, 1 BATHROOM (336 SF) IN ADDITION TO THE PREFABRICATED STRUCTURE, 3 SLATTED WOOD (DECK) STEPS, LESS THAN 30 IN. HT SHALL BE SITE BUILT ADJACENT TO THE STRUCTURE, IN CONFORMANCE WITH THE PRESCRIPTIVE BLDG DEPARTMENT REQUIREMENTS FOR DECK STAIR STRUCTURES.
Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.
Sign up for free calendar updates over email
Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.