Sept. 22, 2026: 134th Ave NE - Kelsey Creek Bridge 10 Repair. The 134th Ave NE bridge project work will consist of removing approximately 7' of the roadway for the bridge approach slabs and replacing with geofoam blocks. Other work will include adding a membrane, sand, rock, csbc, and hma to each approach slab. Removal and replacement of guardrail, fence, and replacing channelization that was removed. The bridge deck HMA and membrane will be removed and replaced with new HMA. Graffiti will be removed from the bridge, CDF will be applied to exposed piles, and temporary traffic control will be utilized. I believe this will be a good candidate for daytime work full roadway closures throughout the project. This could be weekend work if needed.