1300 114th Ave SE
Oct. 13, 2026: Madrona Building Refresh. REPLACEMENT OF EXISTING MAIN ENTRY DOOR AND GLAZING SYSTEM IN SAME SIZE AND LOCATION. REMOVAL OF EXISTING NON-ACCESSIBLE ENTRY RAMP AND REPLACEMENT WITH NEW STONE ENTRY STEPS AND PLANTING BEDS WITHIN THE EXISTING ENTRY FOOTPRINT. EXISTING ACCESSIBLE SIDE RAMPS TO REMAIN. NO EXPANSION OF THE EXISTING BUILDING. INTERIOR WORK UNDER SEPARATE BUILDING PERMIT 26-116605 BW. AREA OF WORK IS OUTSIDE THE FLOODPLAIN (ZONE X). NO FILL WITHIN THE SPECIAL FLOOD HAZARD AREA; NO RISE IN BASE FLOOD ELEVATION.
Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.
Sign up for free calendar updates over email
Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.