Nov. 13, 2026: Bellefield Meter Standardization. This project will install two new large water meter assemblies and one reduced pressure backflow assembly (RPBA). One large meter assembly will be installed at the North water system connection point, located at the intersection of SE 8th St and 114th Ave SE, and one new large water meter assembly and RBPA at the West water system connection, located along SE 15th St next to the Bellefield Sewer Pump Station. Both sites are located within the Bellefield Office Park.
Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.
Sign up for free calendar updates over email
Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.